01
Tile manufacturing facility
Chicago, IL
Complete replacement and upgrade of the electrical distribution system: design, procurement and installation of all equipment and materials, including switchgear, cable tray, wire and cable, and conduit. We removed the existing 3000 A switchgear and installed new 2000 A and 2500 A feeders for downstream loads. Completed over a 3-day shutdown, working 24 hours a day.